Bulletin 2017-2018
Bulletin 2017-2018 (2017-2018)
Up one level
400
CE 422
Geotechnical Design
Foundations, including footings, piers, and piles, and raft foundations. Permanent retaining structures, mechanically stabilized earth, and soil nailed walls. Temporary shoring of excavations. Slope stability fundamentals.
Prerequisite
CE 321
Up one level
400