University of Portland Bulletin 2020-2021

CE 422 Geotechnical Design

Foundations, including footings, piers, and piles, and raft foundations. Permanent retaining structures, mechanically stabilized earth, and soil nailed walls. Temporary shoring of excavations. Slope stability fundamentals.

Prerequisite

CE 321
  • Up one level
  • 400